top of page
Search
SBCLN

Metrolink sets ‘test’ run on new Perris Valley Extension


PERRIS A ‘test’ train will make its first run on the new Perris Valley Metrolink Extension next weekend. It’s the first track expansion of the Metrolink system in more than 20-years. Work began early last year on the 24-mile link which will take riders from the South Perris/Menifee station to downtown Riverside with three stations along the way. Metrolink trains will use an existing BNSF right-of-way that parallels the I-215 freeway, around the base of the Box Springs Mountains behind the UC Riverside campus and through an industrial area of northeast Riverside. Several miles of new track was part of the $248 million project. Signals, crossing gates and warning lights will also be tested during the initial run.


2 views0 comments
bottom of page